Bruce highway Cooroy – Curra Section B – DTMR Project Manager for delivery of development phase for contract 3 through carriageway finishing works and contract 4 including northern Traveston Road interchange and Mary Valley Link Road and new bridge crossing of the Mary River. Role included management and facilitation of an Early Tenderer Involvement (ETI process) for contract 4 involving three construction contractor proponents.


Local Government Infrastructure
Arthur Street / Bowman Road intersection upgrade ($2 Million) – Project Manage
Options development, evaluation, preliminary and detail design and documentation
Cambroon Bridge Replacement – Project Manager
Options evaluation (including low level causeway option) for crossing of Mary River at Cambroon. Preliminary and detail design and documentation.
Brisbane Road Four Lane Upgrade – Project Manager
Planning and Preliminary design for upgrade of Brisbane Road and Walan Street between Culbara Street and Venning Road, Mooloolaba. Project includes consideration of DTMR planning for CoastConnect. Project included an Enquiry by Design (EBD) process.
Brisbane Road Bridge over Tuckers Creek – Project Manager
Brisbane Road Bridge over Tuckers Creek ($5M) – Detail design and documentation for new bridge crossing of Tuckers Creek, Mooloolaba including architectural and urban design development.
Munna Point Bridge Refounding Project – Project Manager
Munna Point Bridge Refounding Project ($6M) - Planning and design for the replacement of foundations for the existing 6 span bridge at Noosa. Work included architectural and Urban design leading to engineering detail design.
Queens Street Upgrade – Project Manager
Queens Street Upgrade –Duplication to 4 lanes at Caloundra including grade separated interchange connection to Nicklin Way and other at grade signalised intersection upgrades.
Evans Street Upgrade – Project Manager
Evans Street Upgrade project – Duplication to 4 lanes at Maroochydore including signalised intersection upgrades.
Mooloolaba Beach Geowall and Replenishment Pipeline
This Project involved constructing a 1450m long revetment wall to protect Mooloolaba Beach, plus construction of 1100m of 400 diameter of HDPE pipeline for dredging discharge and beach renourishment.
Tewantin Trunk Main Relocation (McKinnon Drive and Poinciana Avenue)
This Project involved a design of 450 diameter poly trunk main relocation at the intersection of McKinnon Drive and Poinciana Avenue in Tewantin.
Golden Beach Boat Ramps
This Project involved the design of two boat ramps on Pumicestone Passage for Sunshine Coast Regional Council.
Harbour Parade Boat Ramp
This Project involved the design of triple boat ramps on Mooloolah River for Sunshine Coast Regional Council.
Nambour Landfill Project – Project Manager